LCLS-II Checkout & Commissioning Dashboard LCLS-II project AD internal site AOSD Maintenance Schedules LCLS Run Schedules Daily LCLS MD Calendar Daily SC Linac Calendar Commissioning Sched. (Diagram) LCLS-II First Light Sched. Post-TTO Sched. (2024) ACR links LCLS-II Physics E-Log LCLS-I Physics E-Log SLAC MCC E-Log Daily Shift Report ACR Wiki Checkout & Dashboard All Checklists LCLS-II Device Procedures SRF Comm. Dashboard (smartsheet) Cryo System Checklist Photon Com. Dashboard (Stanford Google acct req'd) Files & References Maint. Requests (CATER) Commissioning SharePoint Commissioning OneDrive Lattice design files LCLS-II Controlled Documents Beamline map folder (from Lisa) EIC / Injector Cu-Linac Restart 2019BSY/LTU/DMP 2019-2020HXR Undulator SXR Undulator SRF/Cavity (Pre-beam)SC-Linac CM01 to BSYdump Spreader/LTU (SC-beam)Post-TTO CommissioningGoal/ScopeLaser EIC Injector Goals/ScopeGoals/ScopeScope with NC-beamScope with SC-beamScope with NC-beamScope with SC-beamGoals/ScopeGoals/ScopeGoals/ScopePost-TTO Goals/TasksEIC planInj._plan Beam On ProceduresBeam On ProceduresBeam On planBeam On planPlan filesPlan files Plan filesScope/Plan filesEIC prebeam ChecksInj+Diag0 prebeam ChecksRemaining tasksInjector Prebeam (Signed)Linac PrebeamBSYH LTUH DMPH BSYS LTUS DMPSPrebeam Checks (Signed: UND, EFC, Mag)Prebeam ChecksPrecooldown and Prebeam Checks (Procedure)Precooldown and Prebeam Checks (Tracking SmartSheet)Prebeam Checkscheckout procedurePrebeam Checks Plan/Schedule (1.0-1.6)Plan/ScheduleLTU Plan OverviewPlan (CuL beam) Plan (CuL beam) Plan/SchedulePlan/Sched (from 2.1)Plan/SchedPlan/SchedPlan/Schedule (SCL beam)Add-Back ListAdd-Back ListAdd-Back ListAdd-Back ListAdd-Back ListAdd-Back ListAdd-Back ListAdd-Back List EIC slidesInjector slidesTraining RecordingCtrls Checkout Summary (Cu) *Ctrls Checkout Folder (Cu)* HXR Undulator calibration statusSXR undulator calibration statusSRF_relevant docs/slidesSRF confluence pageMeeting SlidesTech. Meeting NotesCoordination Meeting NotesLCLS physics meeting (Thu 9am)BCS tasks MPS inputs Post-TTO tasks Post-TTO plan Common filesCommissioning scope one file Machine diagram layout PDF file or PPTX file or PDF file (baseline elements only) or PDF file with controlsHLA GUI task assignment timetableHLA GUI documents; HLA programmer guide; HLA sharepoint Start-to-End simulation filesOther supporting documents; Some archived linksTTO Acceptance Criteria doc; RP high level requirement ; RP requirements on SC operation (2023)Commissioning Leads; Commissioning Issue Tracking20230612_SC inac progress discussion